A farm tractor pulling a fertilizer spreader jack knifed at the Carrying Place bridge around noon on Wednesday. An engineer from Parks Canada, the federal body that maintains and operates the swing bridge will need to inspect for any damage prior to the bridge’s reopening. Motorists are advised to find an alternate route as the estimated time for reopening is unknown.(Desirée Decoste/Gazette Staff)
NewsCarrying Place bridge closed after tractor mishap